Rig 4 Mast Rebuild (March – April 2016)
We recently took the opportunity to strip down and refurbish the mast on Air Core Rig 4.
The mast was:
- Completely stripped;
- Measured and tested;
- Sandblasted and re-painted;
- Re-built with all new components.
The outcome is a new lease of life for the rig. The drill crew were appreciative of the re-build with the rig already back in service and operating brilliantly.
Mast back in the workshop Mast with head re-fitted Mast ready to go back
after being sandblasted on the rig!!
and painted