The first of the two reverse circulation rigs (RC02) we recently acquired was given a thorough review and run up, followed by a drill and hammer test as a shake down before travelling to its first drilling job for Bostech.
It was the ideal opportunity to also get our guys familiar with the rig and equipment, the connections and settings and the overall feel for the rig.
The rig required a few micro adjustments then drilled hard for a couple of days.
The end result was the rig and support equipment was safe, run up and ready to go.